August 2015
New NY Bridge Project Monthly Newsletter
  |    Home   |    Archives


The incredible progress on the New NY Bridge project is becoming more and more visible every day. Residents are literally seeing engineering history in the making. As part of their design-build contract with the New York State Thruway Authority, Tappan Zee Constructors, LLC (TZC) is documenting the construction using both still photography and video. TZC regularly uses a helicopter to get a bird's eye view of the worksite and you can now see the new twin-span bridge rising out of the Hudson River in this slideshow.

As travelers approach the Tappan Zee Bridge from Rockland County, they will soon get a glimpse of the future: An overhead gantry and related equipment is being installed at exit 10 on the southbound New York State Thruway in South Nyack for a temporary all-electronic toll collection (AETC) facility.  
 
Over 60 million pounds of steel bars will fortify the new bridge, more than three times as much steel as is in the iconic Eiffel Tower in Paris. Each of the reinforcing steel bars, called rebar, is treated through a process called "hot-dip galvanization" that provides additional protection against rusting.
 

By the sweat of their brow, construction workers have made impressive progress on the New NY Bridge project. But with near triple digit temperatures increasingly becoming the norm, keeping more than 1,000 workers on the Hudson River at any given time hydrated is of paramount importance.
 
Frequently Asked Questions
Q:
What will happen to the current bridge?  
A:

The current Tappan Zee Bridge will be carefully dismantled, and the structural steel will be recycled. The concrete deck panels, which have been replaced in recent years, will be reused where possible on other Thruway and state Department of Transportation projects.   



Get Your E-ZPass ® 
"On-the-Go"at the
 New NY Bridge Community Outreach Centers

View the latest issues of the
New NY Bridge Magazine

Visit NewNYBridge.com to subscribe for periodic email updates

HOW TO GET INVOLVED
Follow Us on Twitter
and Instagram 

Call the Project Hotline
1-855-TZBRIDGE
(1-855-892-7434)

Westchester: 2 N. Broadway, Tarrytown, NY
Rockland: 142 Main Street, Nyack, NY
Mon-Fri: 11am-7pm | Sat-Sun: 11am-4pm

Visit the Project Website

Email Us
Scenic Hudson RiverWalk Park, Tarrytown, NY
Memorial Park, Nyack, NY
©2015 New York State Thruway Authority